Heat-Max Engineering is an expert player in
Boiler Turnkey Projects and has got enviable expertise in such activities. Our team of craftsmen is capable of furnishing the system as per the need of the customer. We are competent enough to provide solutions for boilers like designing new boiler, supply, erection and execution and commissioning within a stipulated time frame without any project overrun. We are also offer up gradation of the old boilers in areas like pressure part replacement, improving the existing design and over all augmentation in operation.
A turnkey project could involve the following elements depending on its complexity:- Project administration
- Licensing-in of process
- Design and engineering services
- Subcontracting
- Management control
- Procurement and expediting of equipment;
- Materials control
- Inspection of equipment prior to delivery
- Shipment, transportation
- Control of schedule and quality
- Pre-commissioning and completion
- Performance-Guarantee testing
- Inventorying spare-parts
- Training of owner's/plant sub-system operating and maintenance personnel
- Advanced Loop Schemes (primary used in the Electric Utility Industry)